Jackson Geothermal
Case Study 4 - Longtown Health Centre
 

Utilizing 1 Mitsubishi PUHY 400 YGM-A heat pump connected to 2 no 25kw boilers to furnish the hot water requirements to the centre including the Underfloor heating.

The condenser is positioned away from the building with the hot water boilers sited under the stairwell, the pipework is run under the car park.